FedEx Facility
Project type
Civil Engineering, Construction Administration, Land Planning, Landscape Architecture and Stormwater Management
Location
5203, 5321, 5325 Chin Page Rd Durham
Client
Setzer Properties
This 50-acre Fed Ex Freight location is designed to have nearly 100 trucks per day use the facility. This location included 100,000 square feet of freight terminal, maintenance shop, and office space in addition to over 400 spaces for tractor trailer parking. A portion of the 235 staff parking spaces were constructed with permeable paving to minimize the environmental impact on the watershed in addition to the two large wet detention basins to treat and slow the runoff before it enters the stream.